as you may know, I was involved in a car crash a few months ago.
the inspectors have been out, and an engineers report was sent.
the damage is quoted as light rear end damage, only requiring minor repairs and paint to match.
the total cost of this is £600!!!!
after reading through the report, £540 of this is labour costs. meaning the paint and filler that they will use costs £60...and I have to release the car for up to 14 days!!!
even though I don't have to pay a penny as the other insurance are funding this, I am still disgusted at how much they are charging for what is a very small and simple job that should only take a few hours, not a fortnight.
even to buy a new colour coded bumper from Renault and have it fitted by them would only cost £280 with a fitted while you wait service taking around 2 hours (quoted)
no wonder insurance prices are so high when they are paying over double what they need to for a small claim like mine
the inspectors have been out, and an engineers report was sent.
the damage is quoted as light rear end damage, only requiring minor repairs and paint to match.
the total cost of this is £600!!!!
after reading through the report, £540 of this is labour costs. meaning the paint and filler that they will use costs £60...and I have to release the car for up to 14 days!!!
even though I don't have to pay a penny as the other insurance are funding this, I am still disgusted at how much they are charging for what is a very small and simple job that should only take a few hours, not a fortnight.
even to buy a new colour coded bumper from Renault and have it fitted by them would only cost £280 with a fitted while you wait service taking around 2 hours (quoted)
no wonder insurance prices are so high when they are paying over double what they need to for a small claim like mine

, bought a used bumper stuck a ram in the boot and pushed it back out re-sealed it and painted it all for less then £100 


but more of an inconvenience of having to replace hasps and staples as bricks were smashed around the existing fixings.
. A few words were exchanged along the lines of "jog on" where upon a new invoice for £500 was produced instead - still far in excess of what it should have been but at least partly defensible.