- Messages
- 13,280
- Location
- England
Working on this little project at the moment.
Designing as i'm going, no plans, just a guidline size.
The tank fills up with ash from an incinerator, then the chains and paddles drag it up the incline and out the spout into a tiping skip.
Bit of a WIP in these pics...
Tank from 5mm, all sheared edges for outside corner joints. Fully welded in and out.
Tracking from 50x75 angles, stitched on.
Designing as i'm going, no plans, just a guidline size.
The tank fills up with ash from an incinerator, then the chains and paddles drag it up the incline and out the spout into a tiping skip.
Bit of a WIP in these pics...
Tank from 5mm, all sheared edges for outside corner joints. Fully welded in and out.
Tracking from 50x75 angles, stitched on.