I want to install oil central heating in our offices.
I thought it would be a very simple job - but had a few plumbers around who seemed clueless. Too long a run one said. Too much pipe and you will need big bore as it's industrial etc etc.
Not much longer than the house I live in!
Excuse the rough drawing.
Red for rads and red for the boiler. It has to go on the back wall as the front is exposed to 90mph winds and sideways rain.
Looks to me like a very simple setup but I know nothing about plumbing!
Need 8kw in front office and say 4kw in the other 2. Then 2kw in the toilet area. Total of say 18 to 20kw of heat.
I thought it would be a very simple job - but had a few plumbers around who seemed clueless. Too long a run one said. Too much pipe and you will need big bore as it's industrial etc etc.
Not much longer than the house I live in!
Excuse the rough drawing.
Red for rads and red for the boiler. It has to go on the back wall as the front is exposed to 90mph winds and sideways rain.
Looks to me like a very simple setup but I know nothing about plumbing!
Need 8kw in front office and say 4kw in the other 2. Then 2kw in the toilet area. Total of say 18 to 20kw of heat.