Thanks - the vendor has a trolley they made to move it previously but it is a bit ropey. I’m sleeping on the solution, which will likely involve engine crane, some 18mm ply and the 6” posts I just remembered I have.I delivered a Harrison M300 to a guy in Llanelli. Used an engine crane, some skates, scaffold poles and bits of 4x2 to get it into his shed that was 6" off the ground
The skates I have are home made, you're welcome to borrow them but I am an hour from Bristol