h-dom
Member
- Messages
- 595
- Location
- Lincs
As usual this time of year, you go to turn on the heating and nothing happens.
We have a Worcester greenstar 35cdi combi controlled by hive with a strange problem.
The hive system seems to be working perfectly, two green lights on the receiver, 230v to Ls and Lr in the boiler terminal.
Boiler will fire when put in test (man with hat and ladder) for around ten minutes, rads getting up to temp quickly.
It seems although the demand is being requested by the thermostat and receiver, the boiler isn't acknowledging that demand.
Short of stripping the whole front panel and replacing the PCB has anyone got any ideas from experience? I can't even link from the mains input on the terminal to the switched live because the problem seems to be after that, but before anything stopping the boiler from firing.
We have a Worcester greenstar 35cdi combi controlled by hive with a strange problem.
The hive system seems to be working perfectly, two green lights on the receiver, 230v to Ls and Lr in the boiler terminal.
Boiler will fire when put in test (man with hat and ladder) for around ten minutes, rads getting up to temp quickly.
It seems although the demand is being requested by the thermostat and receiver, the boiler isn't acknowledging that demand.
Short of stripping the whole front panel and replacing the PCB has anyone got any ideas from experience? I can't even link from the mains input on the terminal to the switched live because the problem seems to be after that, but before anything stopping the boiler from firing.