Enough progress has been made where I think I can show it to you all.
It’s been very stressful with the electronics, the structural side of it and digging it all out etc.
So as you’re probably all aware, I bought some 100mm box, 8mm wall thickness for the main gate post. Then I think 80x40mm with 4mm wall thickness for the receiver post.
I welded roots (I guess it’s called) onto the bottom of the 100mm box first. One of the roots goes 1100 or 1200mm (I forgot ) towards the other end of the gate so that’s over l 1/3 of the length of the gate rooted out. The it goes about 300mm in the opposite direction and I think 600mm away from my house (this is where it’ll face when it’s open) I welded on some brackets to bolt it to the house as well.
I haven’t really stick welded a lot before but I think i did a good job.
Holes dug out with a little bit of help. If you’re wondering why the cable run is where it is, it’s because there was loads of concrete joins that were very wonky and cracked so I cut it out and squared it all up. I hate things being wonky
The keypads I bought were 5mm wider than the receiver post so made a backing plate and welded it on.
I spent a while working out how to route the cables for the two mag locks. Finally the best thing I could come up with wat a t piece and drill a hole then square up one side. Now both bits of conduit can meet in the middle and go into the post.
It’s been very stressful with the electronics, the structural side of it and digging it all out etc.
So as you’re probably all aware, I bought some 100mm box, 8mm wall thickness for the main gate post. Then I think 80x40mm with 4mm wall thickness for the receiver post.
I welded roots (I guess it’s called) onto the bottom of the 100mm box first. One of the roots goes 1100 or 1200mm (I forgot ) towards the other end of the gate so that’s over l 1/3 of the length of the gate rooted out. The it goes about 300mm in the opposite direction and I think 600mm away from my house (this is where it’ll face when it’s open) I welded on some brackets to bolt it to the house as well.
I haven’t really stick welded a lot before but I think i did a good job.
Holes dug out with a little bit of help. If you’re wondering why the cable run is where it is, it’s because there was loads of concrete joins that were very wonky and cracked so I cut it out and squared it all up. I hate things being wonky
The keypads I bought were 5mm wider than the receiver post so made a backing plate and welded it on.
I spent a while working out how to route the cables for the two mag locks. Finally the best thing I could come up with wat a t piece and drill a hole then square up one side. Now both bits of conduit can meet in the middle and go into the post.