I have been reading a few threads on the subject but still need a little advice.
I have been asked to price up a job with 4 different sections to it. (1 price)
Basically there will be 26 frames, 8'x4' and made of 2"x1" box filled in with 1" wire mesh, there will be 3 smaller frames, aswell with wire mesh. These will have to be made, powder coated and fitted in an underground carpark.
Now I can price up the metal, powder coating, nuts and bolts and anchors but where do I start with the labour ???
I reckon it will take me 30mins to make each panel (inc cutting, drilling and welding) but how do i go about calculating costs like electricity, gas, wire, cutting discs, transport to and from powder coaters and fitting on site ??? I will also need to hire a trailer as my van is too high for the carpark.
Any advice would be grateful.
I have been asked to price up a job with 4 different sections to it. (1 price)
Basically there will be 26 frames, 8'x4' and made of 2"x1" box filled in with 1" wire mesh, there will be 3 smaller frames, aswell with wire mesh. These will have to be made, powder coated and fitted in an underground carpark.
Now I can price up the metal, powder coating, nuts and bolts and anchors but where do I start with the labour ???
I reckon it will take me 30mins to make each panel (inc cutting, drilling and welding) but how do i go about calculating costs like electricity, gas, wire, cutting discs, transport to and from powder coaters and fitting on site ??? I will also need to hire a trailer as my van is too high for the carpark.
Any advice would be grateful.