stevieturbo
Member
- Messages
- 90
- Location
- Norn Iron
I have a custom alloy fuel tank, and would like to weld some additional items onto the bottom. The tank is also foam filled, although there would be no foam directly behind the area to be welded.
Is this a viable proposition ?
I can remove the tank obviously, and will fully drain and clean as best as possible.
So would I just fill the tank with water before attempting to weld, or what would be the best process ?
Or should I give up before Ive started lol ?
Is this a viable proposition ?
I can remove the tank obviously, and will fully drain and clean as best as possible.
So would I just fill the tank with water before attempting to weld, or what would be the best process ?
Or should I give up before Ive started lol ?