brewdexta
The biggest tool in the box
- Messages
 - 5,742
 
- Location
 - UK
 
Just run some services to houses at a higher voltage where the infrastructure is at its limit and have a transformer/EV charger in each house. If it became say 1kv, then the same infrastructure could carry 4 times the power for the same current. I can foresee some interesting problems when a JCB goes through it though 
 Probably also some other issues with insulation breakdown etc. I never said it was perfect  
  
				
			
 Probably also some other issues with insulation breakdown etc. I never said it was perfect  
  




					
				