madkayaker
Pro sparkey Pro Welder
- Messages
- 13,678
i agree that 110V is best (as does the regs) But they no longer prohibit 240V from site etc RCD must be at source e.g. socket or plug. Not sure where the plug in adaptors stand but wired in ones should be fine. The requirements for testing are the same as for the fixed wireing (3 months for site longer for factors etc). Most if not all the plug ones are active units so trip under power failer