Check the back.its over 25 yrs old and deffo 3 phase only its been stuck in a corner and not used for over 10 so is gonna need a good blow out ohh and its well heavy im told
ok chaps have been offered an old miller AC/DC TIG WELDER but its 3 phase and i dont have that so whats involved in gettin it installed and what sort of price cheers steve
250 quid your luckyWorth looking into depends where the cable is situated to where you want the supply. On both occasions I have had three phase installed for under £250the last being 5yrs ago. I dug the track myself for the cable to be laid.
everythings privatised now not subsidised so there out to make as much as possible .the supply company and the metering col got 3 phase in about 10 years ago,l called in a couple of favours l had done for fellas in the VW club,first fella worked for the power company and told me what lampost l had to take it from,second fella worked for a company thats contracted to power company to dig the trenches,he dug the trench and layed the condut,first fella came and put cable in from lampost to garage and on to a board then he told me l had to apply in writting for it to get hooked up or l would get the jail for touching it,then the power company came out and put a meter in and took it from there,there was a bit more to it than that the second fella seen someone at the power company,to watch for my letter and the job was sorted,but l was told it would have been £1500-£2000,haha l dont know where that price came from because its a lot of money for what it was,saying that the lampost was about 50 meters away.
u can if u have the 3phase suply into your premises have u got a single cutout fuse on suply. or is there 3 fuses in the cutout suply???if theres 3 your laughingwhy cant i just have a big socket fitted were the power comes in and then run a armoured extension the 20 meters to my shed
i work for edf energy as a cable jointer and it has to be done propper these days, u need a mpan number so u can get a meter fitted....if u dont get this you will get caught for a illegal supply and it will be cut of and a big bill on your mat a typical single phase is around 700 at the mo and a 3 phase arround 1200 but varies quite a bit from job to job
you wouldn't believe how many illegal supplys we are currently cutting off each month just in my area..... its quite frighting how many people mess with the cables in the road to save a few quid