Morning Guys,
New to this forum so hopefully this is the right section to ask this question...
Looking to help move a welding workshop into a new larger unit. This unit will be used for possibly 15 or more welding bays.
With regards to electrical requirements, i will need to review what is currently in situ but would like to think a 415V 3phase panel will be sat waiting!
Question is, other than panel sizing, loading etc what considerations would you advise or suggest?
For example, would you say a high level floating electrical supply to enable to plug in within the bay better than a standard install on the wall in conduit?
I know its not much of a question but would be nice to pick up all the ideas now before finishing the install and thinking "AH i wish we had done that instead"
Any help would be greatly appreciated!
New to this forum so hopefully this is the right section to ask this question...
Looking to help move a welding workshop into a new larger unit. This unit will be used for possibly 15 or more welding bays.
With regards to electrical requirements, i will need to review what is currently in situ but would like to think a 415V 3phase panel will be sat waiting!
Question is, other than panel sizing, loading etc what considerations would you advise or suggest?
For example, would you say a high level floating electrical supply to enable to plug in within the bay better than a standard install on the wall in conduit?
I know its not much of a question but would be nice to pick up all the ideas now before finishing the install and thinking "AH i wish we had done that instead"
Any help would be greatly appreciated!