Now I have a big problem.

I have fitted most of the UPVC and I am now onto the dry verge.
I have been told to screw into batten ends but they dont extend to within 30 or 40 mm from the edge.
It has a barge board that sits higher than the battens so I can't even use the other method of screwing into a lathe screwed on top of the barge board ladder.
And finally I have now noticed the tiles overlap more than twice the depth of the dry verge. I don't know how they did it next door as I was away when it was fitted.

I have fitted most of the UPVC and I am now onto the dry verge.
I have been told to screw into batten ends but they dont extend to within 30 or 40 mm from the edge.
It has a barge board that sits higher than the battens so I can't even use the other method of screwing into a lathe screwed on top of the barge board ladder.
And finally I have now noticed the tiles overlap more than twice the depth of the dry verge. I don't know how they did it next door as I was away when it was fitted.