They should come straight out renew cable and fit isolator so they have no need to returnthey wont come out and renew the cable and cutout till the work has been completednot even for a temporary supply then. they said they will call the same day . I cant believe that
They should come straight out renew cable and fit isolator so they have no need to return
I did mean isolate after meter thought that would have been obviousThey won't isolate before the meter, encourages tampering. They should have fitted a new cutout without a fuse so the job could be finished without waiting on them turning up
I did mean isolate after meter thought that would have been obvious![]()
.... I would have to be on site with the DNO and the sparky, very cozy in that little cupboard![]()
Just can't get the staff these daysThe DNO won't fit the meter either, hence why I avoid the jobs like the above, as I would have to be on site with the DNO and the sparky, very cozy in that little cupboard![]()
who holds the screw driver for the DNO turn itNew fit the DNO will do it for the cutout, I suspect they may get a joiner in these days![]()
well they came yesterday dug a massive hole up in the -yard.left a big pile of blocks and clay cut the cable then put barriers -round it and a big sign saying road closedffs its a-private courtyard
![]()
the sky dish fitters up this way must now drill a hole in the wall and fit an eye so they can rope ladders when fitting a dish, if not its the sack but if they are removing an old dish they dont have to ropeWater boys were in our (private) yard recently, sorting out a leaking meter, full chapter 8 barriers out, signs, cones the lot all for a 2 foot square hole. Wasn't enough room for all the signs, so they were out on the road outside the gates.
Got talking to them, immediate sacking if they don't do it by the book. Quite a few inspectors sneaking about by all accounts.
the sky dish fitters up this way must now drill a hole in the wall and fit an eye so they can rope ladders when fitting a dish, if not its the sack but if they are removing an old dish they dont have to ropework that one out
i asked the guy why not on removal, he had no idea, yeah i wanted to bin sky other half didntYes, seen the same here. Hard hat, full body harness attached to ladder, ladder lashed off. Better than standing on top of a wheelie bin though
Wonder why they don't to take them down
I binned sky ages ago, full of junk..repeated junk.
yes there not much more in cost than plastic and theres enough knockouts in them for cable -entry --the only hole needed is a 30mm one for the mains tails compression gland the only bad design bit is the metal lid. u have to hold it up to get to the breakers . more than likely if it was other way round -someone would probably -leave it open exposing the breakers to fireso i take it that all replacement CU's must now be metal?
the sky dish fitters up this way must now drill a hole in the wall and fit an eye so they can rope ladders when fitting a dish, if not its the sack but if they are removing an old dish they dont have to ropework that one out