steve.h
Fire Starter,,,,
- Messages
- 347
- Location
- swindon sn4
I was working on £125 a day for small jobs (under 10m2) when I was a tiler, that was 6 years ago, I would never put less than 12mm ply down on a wood floor, I would use flexible adhesive to fix the ply and screws every 12 inches to make a grid. The £125 would be for prep work and tiling regardless, I would never work for less, such as half days etc, a full day rate minimum.



