Parm
Respect The Sound System
- Messages
- 18,005
- Location
- Towcester
Not sure this is the correct section or not but here goes anyway !
I'm planning to build a new workshop very soon as the old ones had it now, prefab concrete panels sinking into ground because it's built on rubbish foundation.
The roof will be 18mm ply covered with felt. Can anyone tell me what the correct technique is for felt application.
I was planning to nail the first layer of sand faced felt to the ply and then cover with a torch on cap sheet as the top layer. Internet research suggests this is correct and in keeping with the relevant standards, in times gone by I've always stuck both layers with hot bitumen.
Can anyone confirm if this is correct or advise otherwise as I quite like the simplicity of torch on system and not having to glue the first layer.
Any help much appreciated
I'm planning to build a new workshop very soon as the old ones had it now, prefab concrete panels sinking into ground because it's built on rubbish foundation.
The roof will be 18mm ply covered with felt. Can anyone tell me what the correct technique is for felt application.
I was planning to nail the first layer of sand faced felt to the ply and then cover with a torch on cap sheet as the top layer. Internet research suggests this is correct and in keeping with the relevant standards, in times gone by I've always stuck both layers with hot bitumen.
Can anyone confirm if this is correct or advise otherwise as I quite like the simplicity of torch on system and not having to glue the first layer.
Any help much appreciated