Jim Davey
R H Davey Welding Supplies Ltd
- Messages
- 5,736
- Location
- Southampton
This is a question I would like to put to the wider audience you get on an international forum. So here it is, for those of you that have calibrations done, how long on average does the engineer spend calibrating (not servicing) and what equipment do you notice he does his tests with. Specifically, do you get a chap turn up with a reasonable sized box (load bank) with half a dozen switches on it and hook it up to your sets?