Tractor Tony
Member
- Messages
- 305
- Location
- Fareham
Having got the steel welding bench I can now see a problem if I want to clamps something prior to welding.
I do not want to go the drilling rows of 18mm holes.
Has anyone else come up with a solution?
I am looking at designing an adjustable clamp with a magnetic base.
I do not want to go the drilling rows of 18mm holes.
Has anyone else come up with a solution?
I am looking at designing an adjustable clamp with a magnetic base.