Looks like this was welded vertical down on 25mm plate.View attachment 363442View attachment 363440View attachment 363437
Not really sure. the box extension has obviously been added later it has been brought up from another farm whilst we had water problems here. It had a 15,000 litre water tanker on it when it broke.The whole things a bodge. They haven’t even bothered to burn the old eye off!!
How long did that last, just out of interest?!?!
Not really sure. the box extension has obviously been added later it has been brought up from another farm whilst we had water problems here. It had a 15,000 litre water tanker on it when it broke.
If something goes wrong are you then held liable?I've been told to spend as little time and money on it as possible. So it's getting straightened welded and a piece of 100x100x10 box on the top of the drawbar to the top of the front chassis plate triangular.
Iam sure I would be. But it won't break again.If something goes wrong are you then held liable?
I don’t know where to start with this but yeh,I've been told to spend as little time and money on it as possible. So it's getting straightened welded and a piece of 100x100x10 box on the top of the drawbar to the top of the front chassis plate triangular.