brightspark
Member
- Messages
- 41,257
- Location
- yarm stockton on tees
finaly got round to doing it after 36 years
reason being the supply armoured is a 4 core 25mm pretty lousy to get it in to a 2way db. cut the braiding back and the earth wire out of it and made the garage a tt supply and fit an earth rod .everyone beefs on about pme in outbuildings but as long as theres no other services in there its ok if I sell the house it wont cause any problems if it gets tested by someone else who has a different take on it the wiring in shed isn't strictly cosher but its protected and can easily be removed. heres the old and new not the neatest but it was all a tight fit
