- Messages
- 13,496
- Location
- England
Midway through this one, been working on it this week few hours an evening...doing it with a mate.
Built primarily for an autograss car to go on.
Most of the frame is folded 3mm sheet. Ally chequer going on top after its painted.
Got frame built, tow bar built, winch mounts sorted, tool boxes, mud guards on, step done.
Just the floor, lights, number plate, ramps and tyre rack to sort now, then off for paint.
27 hours work so far total between us.
Built primarily for an autograss car to go on.
Most of the frame is folded 3mm sheet. Ally chequer going on top after its painted.
Got frame built, tow bar built, winch mounts sorted, tool boxes, mud guards on, step done.
Just the floor, lights, number plate, ramps and tyre rack to sort now, then off for paint.
27 hours work so far total between us.