I need to put in a cable going to the garage, and im not sure about sizing.
Id like to run (all at the same time) -
My CNC machine (say 1.5kw, but probably a bit less)
My biodiesel reactor (about 3.5kw, but currently runs off a 13amp extension lead, so im not sure of the numbers)
...and have my air compressor (3hp) start up all at the same time.
This seems do-able.
If i add a domestic electric oven into the mix, i suspect this gets difficult, right?
The whole lot is about 30m from the consumer unit.
Note, the compressor blows 13amp fuses on startup if its run on an extension lead.
Is this lot even possible to run at the same time? Houses have limited amp supplies, right?
Id like to run (all at the same time) -
My CNC machine (say 1.5kw, but probably a bit less)
My biodiesel reactor (about 3.5kw, but currently runs off a 13amp extension lead, so im not sure of the numbers)
...and have my air compressor (3hp) start up all at the same time.
This seems do-able.
If i add a domestic electric oven into the mix, i suspect this gets difficult, right?
The whole lot is about 30m from the consumer unit.
Note, the compressor blows 13amp fuses on startup if its run on an extension lead.
Is this lot even possible to run at the same time? Houses have limited amp supplies, right?