Hi Guys I'm after a bit of advise please. my wife if opening a hydrotherapy for dogs and we have been pricing up pools which are looking very expensive indeed. my idea is to build a container pool by cutting the top off a 20ft container and then constructing a pool using the following steps from some research.
1. use a plasma cutter to cut the container top off at a height of 1.2m by using a scaffold frame and a couple of block and tackles.
2. reinforce the container by using some square tubing around the top and bottom of the container with a couple of vertical drops.
3.line the inside of the container with 3mm or 4mm mild steel sheets and welded water tight. now this is where I could really use some advice. I have contacted about 10 fabricators and welders in my area and not had a reply to my email from any of them which makes me wonder if its a daunting task? my next thought is how possible this would be to do myself? I did a lot of stick welding about 15 years ago but was by no means a professional. I did look at hiring a mig welder and to have a go at a couple of cut offs but that comes in at £176 so my next question is would it be worthwhile purchasing a second hand one with a budget of about £400? we have a warehouse where the hydrotherapy will be opened that has 3 phase power available.
4. looking to use a marine epoxy to line the container then add all the pumps and necessary accessories. any advice and thoughts on this project will be greatly appreciated. thanks in advance.
				
			1. use a plasma cutter to cut the container top off at a height of 1.2m by using a scaffold frame and a couple of block and tackles.
2. reinforce the container by using some square tubing around the top and bottom of the container with a couple of vertical drops.
3.line the inside of the container with 3mm or 4mm mild steel sheets and welded water tight. now this is where I could really use some advice. I have contacted about 10 fabricators and welders in my area and not had a reply to my email from any of them which makes me wonder if its a daunting task? my next thought is how possible this would be to do myself? I did a lot of stick welding about 15 years ago but was by no means a professional. I did look at hiring a mig welder and to have a go at a couple of cut offs but that comes in at £176 so my next question is would it be worthwhile purchasing a second hand one with a budget of about £400? we have a warehouse where the hydrotherapy will be opened that has 3 phase power available.
4. looking to use a marine epoxy to line the container then add all the pumps and necessary accessories. any advice and thoughts on this project will be greatly appreciated. thanks in advance.




			
			
			
and how much heat loss ??, because you will HAVE to heat it, you cant put an animal and you  in freezing water
, in winter and expect them to enjoy it ??