Does anybody have experience of welding EN8M, we have had produced a large machined block from this material & it is under-size in a tenon key-way, the supplier is suggesting it can be TIG welded and then machined back to achieve size. this is a large piece of EN8M approx 400mm x 200mm with lots of machined features on it. My concerns are that the welded area will be visible after machining back and the penetration/robustness of the weld may not last or crack in the future.
Any guidance appreciated
Any guidance appreciated