seriesonewelder
Member
- Messages
- 640
- Location
- West Midlands
calling @spencer 427
We've had a quote to re-surface the drive, the present surface is nearly 50 years old (believed to be original). Cheapest option is make good the pot holes of which there a few, bringing the holes up-to level and then laying over the existing drive with 40mm.
Or, dig out and start again which is £3k more. The cheaper option does make sense as the subsurface base is already there.
Would the cheaper option be as good - will it last another 50 years??
It is a shared drive serving 5 houses so several vehicle movements a day.
We've had a quote to re-surface the drive, the present surface is nearly 50 years old (believed to be original). Cheapest option is make good the pot holes of which there a few, bringing the holes up-to level and then laying over the existing drive with 40mm.
Or, dig out and start again which is £3k more. The cheaper option does make sense as the subsurface base is already there.
Would the cheaper option be as good - will it last another 50 years??
It is a shared drive serving 5 houses so several vehicle movements a day.