planning to make a frame with 40x40x3 aluminium
There's 3 parts that need to sit flush against a wall, an upright about 2metres tall with a weld at the top...about halfway up and at the bottom, also a horizontal bar with a weld at both ends and the middle.
Welding needs to be done away from the wall
any tips?
Thanks
There's 3 parts that need to sit flush against a wall, an upright about 2metres tall with a weld at the top...about halfway up and at the bottom, also a horizontal bar with a weld at both ends and the middle.
Welding needs to be done away from the wall
any tips?
Thanks