malcolm
& Clementine the Cat
- Messages
- 9,729
- Location
- Bedford UK
Am I right in my reading of the current Part P http://www.planningportal.gov.uk/uploads/br/BR_PDF_AD_P_2013.pdf
I've knocked the kitchen back to the structure and the current wiring falls way short of the IEE 17 3rd edition and all that so I was thinking about doing it properly to current IEE guidelines.
Kitchens aren't mentioned as notifiable in the current Part P and I don't need any new circuits. Does that mean I can do it again properly myself or do I need to employ a competent person and then fix their bodges myself later on if I have my normal luck with tradesmen?
I've knocked the kitchen back to the structure and the current wiring falls way short of the IEE 17 3rd edition and all that so I was thinking about doing it properly to current IEE guidelines.
Kitchens aren't mentioned as notifiable in the current Part P and I don't need any new circuits. Does that mean I can do it again properly myself or do I need to employ a competent person and then fix their bodges myself later on if I have my normal luck with tradesmen?