@thinfourth asked for a picture of my mill(used to be his) with the extension fitted
@Pete. kindle made a new trapezoid 3mm x 24mm thread that was 16cm longer than the original, I also built a suds tank, using the unused 3 phase suds pump on my boxford lathe, converting it to single phase, just needs the hose and the tap/end fitting
![IMG_0205[1].JPG IMG_0205[1].JPG](https://www.mig-welding.co.uk/forum/data/attachments/104/104119-a870503fe969e07920e6775624eb47c1.jpg?hash=qHBQP-lp4H)
@Pete. kindle made a new trapezoid 3mm x 24mm thread that was 16cm longer than the original, I also built a suds tank, using the unused 3 phase suds pump on my boxford lathe, converting it to single phase, just needs the hose and the tap/end fitting
![IMG_0205[1].JPG IMG_0205[1].JPG](https://www.mig-welding.co.uk/forum/data/attachments/104/104119-a870503fe969e07920e6775624eb47c1.jpg?hash=qHBQP-lp4H)