Hello everyone,
I would like to set up my sheilding gas with seperate bottles of argon and co2. I am looking for the most cost effective (cheap) way to this.
I was thinking a flowmeter ( each with preset 25 psi reg ) for each tank, into a " Y or T " fitting and then into the mig. Sounds like it would work??
Then I could adjust my flows according to what I need for a ratio and material I am working on.
I would love to hear ideas and thoughts on the subject, any advise is very welcome, but again I dont want to spend more then I need to for this.
Thank you to everyone for the help I've got on my other questions!!!
I would like to set up my sheilding gas with seperate bottles of argon and co2. I am looking for the most cost effective (cheap) way to this.
I was thinking a flowmeter ( each with preset 25 psi reg ) for each tank, into a " Y or T " fitting and then into the mig. Sounds like it would work??
Then I could adjust my flows according to what I need for a ratio and material I am working on.
I would love to hear ideas and thoughts on the subject, any advise is very welcome, but again I dont want to spend more then I need to for this.
Thank you to everyone for the help I've got on my other questions!!!

It just seems that if both preset regs are the same pressure they would't appose the other and would go into " T " not holding the other back. The flowmeter would decide how much gas should go into the " T " if you know what I mean. Well sounds good to this brain matter anyway


