Pretty much as above, I'm dry lining over existing ceiling in down stairs Hall, when I get to the bottom of the staiirs it extends over the bottom of the stairs and I have Aprx 3ft flat same as Hall but then 3ft runs up the stairs at Aprx 45d, what's the best way to do the joint between flat and 45, will tape be OK if I fill the joint with adhesive then use jointing filler, would the mesh be stronger although I would have to build up higher and feather off further to stop the squares on the tape mesh showing through.
Or should I be looking at cutting into board making a recess and fixing in some stainless or galvanised mesh?
Obviously I'm not a professional at this or I wouldn't be asking, I'm fine with tape joints and skimming if req but I would sooner not have to skim the entire Hall ceiling.
Advice mucho appreciated.
Or should I be looking at cutting into board making a recess and fixing in some stainless or galvanised mesh?
Obviously I'm not a professional at this or I wouldn't be asking, I'm fine with tape joints and skimming if req but I would sooner not have to skim the entire Hall ceiling.
Advice mucho appreciated.