what’s a typical curing time for 100 mm depth,poured at 0-5 degrees? Thanks.
I believe if the concrete is ready mix concrete it reaches the specified strength at 28days, in an ideal world you don't want heavy traffic over it before that.what’s a typical curing time for 100 mm depth,poured at 0-5 degrees? Thanks.