My mother was assessed recently, and approved to receive free gas central heating installation (current system is 20+ years old, and no doubt very inefficient) under some scheme available throught the Scottish government, will be something like "warmfront"?
Engineer arrived at my mothers to view what would be involved, measure up ect, just of the phone from a now panicking OAP, as she was apparently told installation cannot go ahead, something to do with house wiring, engineer told my mum, whole house has to be rewired.
Anyone advise why a whole house would require a complete re-wire prior to having a new heating system installed? Sounds like a cop out.............but hey-ho could be some merit for it!!
Sorry if a bit vague, I told me mum to call me when engineer was to arrive, just like a bit of info before I tackle them on Monday.......
Thanks in advance.
Ps, don't know last time house was re-wired, but I can tell you, if anything looked dangerous, or fuses popping, my sis and I would have something done about this.
Engineer arrived at my mothers to view what would be involved, measure up ect, just of the phone from a now panicking OAP, as she was apparently told installation cannot go ahead, something to do with house wiring, engineer told my mum, whole house has to be rewired.
Anyone advise why a whole house would require a complete re-wire prior to having a new heating system installed? Sounds like a cop out.............but hey-ho could be some merit for it!!
Sorry if a bit vague, I told me mum to call me when engineer was to arrive, just like a bit of info before I tackle them on Monday.......
Thanks in advance.
Ps, don't know last time house was re-wired, but I can tell you, if anything looked dangerous, or fuses popping, my sis and I would have something done about this.