I want to weld some 25x25 box, 1.6mm, and there are a lot of joints like the one pictured. Fortunately I am able to turn the structure (a car chassis) so as to get whatever is the best angle.
Should I do the red or the blue weld first, and when I do the red weld I'm not sure exactly where I should start and stop, in other words, where the overlap should be.
Hope this makes sense
Should I do the red or the blue weld first, and when I do the red weld I'm not sure exactly where I should start and stop, in other words, where the overlap should be.
Hope this makes sense