I've become the Chair of our local Scout group, and there's a load of refurb work to be done. The hut is basically the same as when I was a Scout there 40 years ago.
One big problem is the wood floor which is a bit splintery, previous chair used to varnish it every year or so to keep them stuck down, but there's a toddlers football group uses it and the splinters are becoming a problem. They are a source of external income so need to keep them engaged.
Looks like all the nails have been banged in a long way so we should be able to sand over without having to spend a week hammering first. I know I could hire someone to do it, but then I see a floor sander is not that much to hire. It'll be horrible messy hard hot work, but worth doing I hope.
Does anyone have experience of doing this? How much area can you cover in a day?
One big problem is the wood floor which is a bit splintery, previous chair used to varnish it every year or so to keep them stuck down, but there's a toddlers football group uses it and the splinters are becoming a problem. They are a source of external income so need to keep them engaged.
Looks like all the nails have been banged in a long way so we should be able to sand over without having to spend a week hammering first. I know I could hire someone to do it, but then I see a floor sander is not that much to hire. It'll be horrible messy hard hot work, but worth doing I hope.
Does anyone have experience of doing this? How much area can you cover in a day?