- Messages
- 13,280
- Location
- England
Could do with moving a waste pie to below the floor level...
Basin on the right of the sketch, currently runs above the floor level.
Soil stack, pretty tight under joists in the bathroom, where it goes into a tee by the looks of it. Vent pipe upwards, then disappears into the oversight built up around it.
If I knock out a bit of the concrete, and there's room, fit a strap boss and run pipe... but as the sketch, that would be lower than the soil pipe from the toilet.. acceptable or a no no?
Basin on the right of the sketch, currently runs above the floor level.
Soil stack, pretty tight under joists in the bathroom, where it goes into a tee by the looks of it. Vent pipe upwards, then disappears into the oversight built up around it.
If I knock out a bit of the concrete, and there's room, fit a strap boss and run pipe... but as the sketch, that would be lower than the soil pipe from the toilet.. acceptable or a no no?