Trevorleach
Member
- Messages
- 1,483
- Location
- UK
I have quite a bit of concrete to break up, I reckon a couple of skips full, plus a 40 foot long wall 3 feet high.
So will one of them cheap electric jobs from toolstation/screwfix do the job or should I hire a hydraulic unit like the JCB Beaver?
I really want something that will do the job and not cause me immense frustration at its lack of go/grunt.
So will one of them cheap electric jobs from toolstation/screwfix do the job or should I hire a hydraulic unit like the JCB Beaver?
I really want something that will do the job and not cause me immense frustration at its lack of go/grunt.