- Messages
- 14,807
- Location
- UK
This will be of no interest to most
Need to form 21 tapered T sections (Large gantry canopy), 3m long. Starts off as a 457*152*52 UB, with the bottom flange stripped away leaving 450 ish at one end, and 300 depth at the other.
Cutting it is ok, hellofajob, but we can do it - whats the best way of keeping/getting it back straight once it arches its back?
Anyone stripped flanges of beams that big?

Need to form 21 tapered T sections (Large gantry canopy), 3m long. Starts off as a 457*152*52 UB, with the bottom flange stripped away leaving 450 ish at one end, and 300 depth at the other.
Cutting it is ok, hellofajob, but we can do it - whats the best way of keeping/getting it back straight once it arches its back?
Anyone stripped flanges of beams that big?






Must be someone round your way with one...?