I'd converted a breakfast room and adjacent bathroom into a kitchen/diner/snug room and a kitchen into a utility room and shower room.
He came in with a trainee and did the most cursory of inspections, asked a few questions and took all my responses at face value and didn't really check anything for himself. All in they were only here for about 5 to 10 minutes. Didn't even have a look outside at my drainage work.
Only one corrective action needed which I did argue with a bit, but given its only £30 to correct I accepted just to move on without any major issue.
I'd installed a new interconnected heat/smoke/CO alarm system in the new rooms and lower and upper landings but nothing in our existing formal sitting room. I argued that the regs say that there must be one in the main living room. I told him that our snug was our main living room and not the sitting room. He is wrong and I argued a bit but gave in just to get rid of them and get my completion certificate.
He came in with a trainee and did the most cursory of inspections, asked a few questions and took all my responses at face value and didn't really check anything for himself. All in they were only here for about 5 to 10 minutes. Didn't even have a look outside at my drainage work.
Only one corrective action needed which I did argue with a bit, but given its only £30 to correct I accepted just to move on without any major issue.
I'd installed a new interconnected heat/smoke/CO alarm system in the new rooms and lower and upper landings but nothing in our existing formal sitting room. I argued that the regs say that there must be one in the main living room. I told him that our snug was our main living room and not the sitting room. He is wrong and I argued a bit but gave in just to get rid of them and get my completion certificate.