eLuSiVeMiTe
Member
- Messages
- 16,438
- Location
- ......
Been niggling me since I started looking for a welder but still haven't had a sparks around for a look.
Looks like I have 3 feeds to my meter.
If that's the case how would I go about acquiring a 3p supply to run a lathe, Mill and any other late night eBay buys... What would be the benefits of running 415v 3p motors over 240v 1p with a 3p
inverter/vfd
Black box to the left of the meter looks to be for old storage heaters. CH installed at a later date judging by the pipes running around skirting and down walls.
Tya.
Looks like I have 3 feeds to my meter.
If that's the case how would I go about acquiring a 3p supply to run a lathe, Mill and any other late night eBay buys... What would be the benefits of running 415v 3p motors over 240v 1p with a 3p
inverter/vfd
Black box to the left of the meter looks to be for old storage heaters. CH installed at a later date judging by the pipes running around skirting and down walls.
Tya.



if you have to fill any paperwork in. I looked and asked a few unofficial questions to a few uk power guys looks like if it went 3p i would lose the 80a single and have 40a 3p&n. its not worth the loss of the heave single phase supply.
u already have the 3 phase supply which will be 60 amp minimum for nightstore heaters just tell em your changing to day rate panel heaters give them a loading requirement and need the 3 phase for a couple of small motors and that's it .they wont down rate nothing and wont refuse u it 