Kayos
Gone......
- Messages
- 9,046
- Location
- Yorkshire
Managed a day on this job today, still a bit to finish
Wrong UV unit supplied and no time to exchange, customer insisted it was vertical
It's not a whole house system so no need to bypass everything individually, it can all be bypassed and turned off for maintenance or if the well level drops
Had to climb down the well first thing to fit a foot valve, pump was nice and easy to prime
Wrong UV unit supplied and no time to exchange, customer insisted it was vertical
It's not a whole house system so no need to bypass everything individually, it can all be bypassed and turned off for maintenance or if the well level drops
Had to climb down the well first thing to fit a foot valve, pump was nice and easy to prime