Sam
Banned
- Messages
- 1,203
This weeks work is piping up a micro brewery in Kelso a few miles from me. The tanks are second hand and have been modified two are new. All pipes have to be purged with argon prior to welding.
The best part of the day involved positioning and finding a level for the tanks, the brewery is sited in an old dairy so the floor has a natural run.
Looking forward to the first brew.
The best part of the day involved positioning and finding a level for the tanks, the brewery is sited in an old dairy so the floor has a natural run.
Looking forward to the first brew.