brightspark
Member
- Messages
- 39,474
- Location
- yarm stockton on tees
just spent 2 days earlier this week at a school strapping a ton of cables to a concrete roof down the main passage about 25 meters masses of cables. they renewed the old suspended ceiling and all the cables were just laid on top of it used thin steel tie wraps and galve band. the hardest was 15 meters of 4 core 25mm swa took 3 of us to get it clipped up