Planning on extending an existing 15ft x 9ft slab. The 9ft side is to be brought out to 11.5ft.
I've laid the MOT 1 and compacted it, made up the formwork, just gotta place a DPM and then pour the concrete.
Just wondered if there's anything I ought to be aware of/have missed out before I begin?
Thanks
I've laid the MOT 1 and compacted it, made up the formwork, just gotta place a DPM and then pour the concrete.
Just wondered if there's anything I ought to be aware of/have missed out before I begin?
Thanks