The Z'eer
Member
- Messages
- 1,176
- Location
- Essex
At present I'm in the process of building a timber structure 15ft x 9ft x 8ft for the purpose of individually painting car body panels (a skill I'm yet to acquire).
A little research revealed this http://www.mig-welding.co.uk/forum/threads/building-designing-a-spray-booth.28541/ and very interesting it is too.
I'm intending to purchase an air fed mask and the necessary equipment for its usage. My question is this: Do I actually require negative pressure airflow and extraction in the booth if using an air fed mask and spraying one panel at a time?
Thanks
A little research revealed this http://www.mig-welding.co.uk/forum/threads/building-designing-a-spray-booth.28541/ and very interesting it is too.
I'm intending to purchase an air fed mask and the necessary equipment for its usage. My question is this: Do I actually require negative pressure airflow and extraction in the booth if using an air fed mask and spraying one panel at a time?
Thanks