Luke
Forum Supporter
- Messages
- 1,929
- Location
- Whitchurch, Shropshire
This project probably started around 3 years ago, in terms of the thinking and the initial drawings, however, it was just under a year ago that I took delivery of a load of 60 x 60 x 4 SHS, some cut to length UB and UC, and just over 400 laser cuts parts.
Most of the brackets were made from flat parts welded together. It took a couple of weekends to jig them up, tack them, then store them ready for final assembly and welding. If I did anything like this again, I'd get the supplier to bend them for me. I didn't realise how long it would take.
Once the brackets were ready, some proper assembly and welding could begin.
Most of the brackets were made from flat parts welded together. It took a couple of weekends to jig them up, tack them, then store them ready for final assembly and welding. If I did anything like this again, I'd get the supplier to bend them for me. I didn't realise how long it would take.
Once the brackets were ready, some proper assembly and welding could begin.