Smackfiend
Member
- Messages
- 17
Hi there,
I've etched primed my floor pan and I'm up to the stage of applying PU seam sealer and I'm just wondering if there is a standard time that I need to leave the sealer to cure between coats (primer then top coat).
I can only work on my car every one or two weeks, so can I seal then prime, paint one / two weeks later or do I need to apply the top coat while the sealer is still curing / flexible.
The brand I'm using is the Starchem (yellow tube) type and don't want to apply it then leave it a week or two before the top coats to find it has cracks in it / lifted.
Thanks in advance,
Ian
I've etched primed my floor pan and I'm up to the stage of applying PU seam sealer and I'm just wondering if there is a standard time that I need to leave the sealer to cure between coats (primer then top coat).
I can only work on my car every one or two weeks, so can I seal then prime, paint one / two weeks later or do I need to apply the top coat while the sealer is still curing / flexible.
The brand I'm using is the Starchem (yellow tube) type and don't want to apply it then leave it a week or two before the top coats to find it has cracks in it / lifted.
Thanks in advance,
Ian