Depends on the cylinder fill pressure. 200Bar x 10 litres = 2000 litres at atmospheric pressure so, at 10 l/min should last 200 mins. 300Bar should last 300 mins. Actual welding time will be less than this, due to wastage filling and emptying the regulator, purging the lines, and pre and post-flow.