Problem with it is it leaks it's not not the work its self its fact I asked for it to be done right was qouted but it was not done how I asked i am willing to pay the money for it to be done right
fair enough and maybe but I didn't want to tackle it with my cheap £80 welder and the stuff I put on it is meant to kill the rust off and I put a few coats on a week before he came and did the work so hopefully, it is kept at bay for a little while
when I say double skin I mean there was some kind of flexible stick patch of it this was factory this area is there it drains down from the engine bay so no standing water as such I think he just patched because be a fair bit of work as the brake pedal plant is on the back of this area
I have put a coat of Bilt Hamber Hydrate 80-https://www.amazon.co.uk/gp/product/B00672US20/ref=ppx_yo_dt_b_asin_title_o00_s00?ie=UTF8&psc=1 over the area so far I will put a second coat of this evening then what I am going to do is put some tiger seal over the joints to seal them then some...
Hello I was hoping to get some advice I have had some welding done on my car I asked for the work to be done to last but iv ended up with just a patch welded over the top of a hole I did treat the metal my self before the work with some Bilt Hamber Hydrate 80 I will put some photos up of before...