vertical welds
In reference to the last question, I was welding 1/2" steel aprox 7" long. I chamfered both sides of the plate leaving about a 1/8" root gap. I made two passes starting from the top to the bottom.(one 1/4" weld to help fill the root gap and about a 1/2" wide weld to blend the two...