Hi all. Hopefully I can get my head round posting pictures off my phone
Currently working on a project at CERN in France.
The room has to be maintained at 10 degrees C.
So we have various units supplying ducting to take to the room.
First we have a pre conditioner this uses chilled water at 6 degrees C, it has a chilled water supply in 2" stainless steel, currently in the progress of making the pipe spools up all 100% X-rayed and done to EN287
The pre conditioner supply's cold air to a Dessicant wheel basicly a air to air heat exchanger, which then supply's a air handling unit with a DX (refrigerant) coil and then gets blasted into the room.
Ill try and get some pics up now think I can only post one at a time
If any of the mods know how to merge posts that woul be great
This is the AHU
This is the Dessicant wheel
Pre conditioner
2" bends pre cleaned and ready for welding
Root inside pipe
Pipe spool
Currently working on a project at CERN in France.
The room has to be maintained at 10 degrees C.
So we have various units supplying ducting to take to the room.
First we have a pre conditioner this uses chilled water at 6 degrees C, it has a chilled water supply in 2" stainless steel, currently in the progress of making the pipe spools up all 100% X-rayed and done to EN287
The pre conditioner supply's cold air to a Dessicant wheel basicly a air to air heat exchanger, which then supply's a air handling unit with a DX (refrigerant) coil and then gets blasted into the room.
Ill try and get some pics up now think I can only post one at a time
If any of the mods know how to merge posts that woul be great
This is the AHU
This is the Dessicant wheel
Pre conditioner
2" bends pre cleaned and ready for welding
Root inside pipe
Pipe spool